통나무사이딩

페이지 정보

profile_image
작성자톰과제리 조회 3회 작성일 2021-04-18 00:13:33 댓글 0

본문

세라믹사이딩 적용 22평 횡성 하이브리드통나무집

자정기능이 탁월한 세라믹사이딩을 적용한 통나무집입니다.
전통구들방을 설치하여 겨울철 난방비를 획기적으로 절감시키며
따끈따끈한 아랫목 찜질을 즐길수 있습니다.

EverLog Concrete Log Siding Installation by EverLog Systems

EverLog Concrete Log Siding Installation by EverLog Systems - http://www.everlogs.com/everlog-concrete-log-siding/

Transcript:

Welcome to EverLog Systems, the best way to build a log and timber home.

This video is a basic introduction on installing EverLog Siding, which is a revolutionary engineered concrete siding product used in both renovations and new construction.

EverLog Siding is maintenance free; light weight; fire resistant; resistant to mold and other decay; resistant to insects; easy to install with common tools and screws; and provides a variety of other benefits

Installation of our EverLog siding is simple and can be completed by any contractor or do-it-yourselfer. In conjunction with our installation guide, this video will show you just how easy installation can be.

EverLog Siding comes pre-finished and is packaged in durable crates. A forklift is required to unload crates from the trailer. Contact EverLog Systems for crate weight and forklift recommendations, Also reference our EverLog Siding crate handling and siding removal instruction manual. The crates should be placed on level ground with 2x4 blocks under the front to provide a slight tilt from front to back.

Partially remove top screws using T-30 bit included with delivery, carefully set lid aside. Partially remove front scr3ews on both right and left end panels, fully remove screws from front bottom front panel and reserve for re-assembly. Carefully lay front panel down.
Using two people carefully tilt siding up and lift on edge, always carry panels on edge. Place packaging foam in a safe place until crate is empty at which point the foam can be placed back into the crate before closing crate up in reverse order of disassembly. Crates containing corners or other custom components may have additional bulkhead screws that need removed prior to removing face panel.

Installation requires a few common tools. A four and one-half inch electric angle grinder and accompanying four and one-half inch masonry blade is recommended for most if not all cutting. A hole-saw may also be needed for round cuts such as dryer vents or plumbing penetrations. A high-speed cordless drill or two with extra batteries is also recommended. EverLog Systems recommends using GRK Cabinet® Screws along with the companion HSS Bit Holder, also made by GRK to ease installation.

As with any construction task, proper safety and protection equipment such as safety eye and ear protections, respirators and gloves should be used at all times when handling and cutting concrete materials.

Prior to installing any siding, outside and inside corners need to be installed first. Our corner posts come in stock ten-foot lengths so most corners will need to be cut to fit on site prior to their installation. After measuring the short and long lengths, mark the corner with a speed square with the length or angles needing to be cut. Care should be taken when planning cuts and strap locations. The angles can then be cut using the angle grinder.

Once the corner is cut and fits nicely, unfold the embedded installation straps and securely fasten the corners to the wall using two screws per strap.

After cutting and installing corners you’re ready to begin horizontal siding installation. Install and secure HSS Bit Holder into the drill, refer to GRK instructions for the bit holder’s adjustment instructions. Place Cabinet® screw onto bit holder and press against panel flange, the magnetic bit holder will secure the screw during driving.

Using a high speed setting, drive the self-tapping screw into the center of the flange, a minimum of two inches from the end. Speed should be reduced just before setting screw snugly against the siding flange taking care not to over-tighten. Repeat process taking care to hit the stud locations. Panels should be spaced one eighth inch apart end to end and end to corners to allow for expansion and contraction. All butt joints should be factory end to factory end with cuts placed against corners or other trim.

Cutting Siding

Because EverLog Siding comes in stock twelve-foot lengths it will need to be cut to fit. Measure length of siding needed, again allowing for one eights inch gaps on ends. Mark length needed on siding, a template tool can be made to automate markings for square or pitched cuts. Mark the siding with a clearly visible line. Place blocking under the siding to allow four and one-half inch masonry blade to penetrate through the siding. Once safety equipment is in place and clear of obstructions, begin cutting siding. Hold the angle grinder securely and parallel to the cut, after cutting brush dust from the surface of the siding using a soft bristled nylon brush. Each profile of siding is cut using similar methods.

Please call EverLog Systems at 877.257.5647 with any questions and refer to our siding installation guide at http://www.everlogs.com/everlog-siding-brochures-technical-information/.

외장재,,사이딩은 뭐가 좋을까?세라믹,시멘트,목재,비닐?????

주택건축,전원주택의 중요 외장재인 사이딩의 종류와 특성을 파악하여 선택에 참고하시길 바랍니다 .
772건축이야기 칠칠이 올림 ^^

... 

#통나무사이딩

댓글목록

등록된 댓글이 없습니다.

전체 2,658건 1 페이지
게시물 검색
Copyright © www.iamjangmi.com. All rights reserved.  Contact : help@oxmail.xyz